Saunier Duval Thelia 30 E Istruzioni per gli Interventi

Navigare online o scaricare Istruzioni per gli Interventi per Accessori per il raffreddamento hardware Saunier Duval Thelia 30 E. Saunier Duval Thelia 30 E Operating instructions Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa

Sommario

Pagina 1 - 01773 828400

1THELIATHIS IS A CAT II2H3+ APPLIANCE01773 828100IN WARRANTYTECHNICAL HELPLINE01773 828400

Pagina 2

10TECHNICAL DATATHELIA 23THELIA 23 ETHELIA SB 23Heating useful output, adjustable from... (kW) 8,9 8,9 8,9(BTU/H) 30,000 30,000 30,000to...

Pagina 3 - INTRODUCTION

11DIMENSIONSOPENING THE CONTROL PANEL COVERHab 129Hab 132THELIA 23, THELIA 23 ENet weight : 41 kgGross weight : 43 kgTHELIA SB 23Net weight : 40 kgGro

Pagina 4

12BOILER SCHEMATICShy 067aDiagram. 21THELIA 23, THELIA 23 EABCDF4305612142119318171516789101113232212201-"ON" push - button.2-"OFF"

Pagina 5

13Shy 068aDiagram. 22THELIA SB 2314 - Multi - functional control.16 - Hight limit thermostat.17 - Ignition electrode.18 - Pilot19 - Hot water thermist

Pagina 6 - CLOCK - INSTRUCTIONS FOR USE

14THELIA 23, THELIA 23 EFrom left to right, the connection plate is equipped with :THELIA SB 23From left to right, the connection plate is equipped wi

Pagina 7 - CLOCK - INSTRUCTIONS FOR USE

15Water connectionConnect the water pipes to the fixing jig con-necting plate using the copper tails supplied.Warning : To prevent damage to the isola

Pagina 8

16DOMESTIC HOT WATER SYSTEM DESIGN● Copper tubing must be used for the domestichot water system. Unnecessary pressure lossesshould be avoided.● The bo

Pagina 9

17BOILER LOCATIONVen 060aNCDMOPABEFGIHLDiagram. 26A-under a window ...

Pagina 10 - TECHNICAL DATA

18The boiler is supplied for rear outlet flue connec-tion.Alternatively, the boiler is designed to allow theflue system to be connected to the top of

Pagina 11 - DIMENSIONS

19Important : when cutting the flue hole and whenextending the flue centre line to a side wallremember that the flue system must have a fall ofabout 3

Pagina 12 - THELIA 23, THELIA 23 E

2INSTALLATION AND OPERATING INSTRUCTIONSTHELIA 23, THELIA 23 E, THELIA SB 23Mandatory warning notice for CEE countriesWARNING, this appliance was desi

Pagina 13 - THELIA SB 23

20Refer to table 1 for the cutting lengths of both thePVC and the aluminium flue pipes for each of thevarious flue options available.Important. All cu

Pagina 14

21Diagram 38Locking fitting endDiagram 39Installation of flue assembly● Fit the PVC pipe (A) into the wall with lockingfitting end to outside.● Fit th

Pagina 15 - HEATING SYSTEM DESIGN

22TOP OUTLET FLUE ASSEMBLYTop outlet flue - Kit 85089The boiler is supplied for rear outlet flue connec-tion. For a top outlet flue :● Unscrew and r

Pagina 16 - Diagram. 25

23TOP OUTLET FLUE ASSEMBLYCalculation of flue cutting lengthsMeasure the wall thickness e (mm)For side flues, measure distance from inside faceof the

Pagina 17 - Diagram. 26

24ELECTRICAL CONNECTIONwire link fitted between the top two terminals ofthe connector is left in place, see diagram 50a.A 230V room thermostat can be

Pagina 18 - REAR OUTLET FLUE ASSEMBLY

25ELECTRICAL CONNECTIONNo external controls No external controlsRoom thermostat onlyRoom thermostat onlyRoom thermostat and time clockFactoryfitted li

Pagina 19 - E F D C B A

26COMMISSIONINGThe commissioning and first firing of the boiler mustonly be done by a competent person.Gas installation● It is recommended that any ai

Pagina 20

27● Turn the knob (dia-gram. 56) to switch theboiler ON and OFF: cloc-kwise to increase thetemperature, anti-cloc-kwise to decrease. Theburner will au

Pagina 21

28OPERATING SAFETY DEVICESAir flow rate safety deviceIf an obstruction, even partial, of the flue occursfor any reason whatsoever, and causes reductio

Pagina 22 - TOP OUTLET FLUE ASSEMBLY

29SETTINGSBypassThe built-in bypass must be adjusted accordingto the requirements of the system. Refer to the flowrate pressure curve (diag. 19 p. 11)

Pagina 23

3INTRODUCTIONThe boilers have a fan assisted balanced fluewhich both discharge the products of combustionto and draws the combustion air from the outs

Pagina 26 - COMMISSIONING

32“Le Technipole” - 8, av. Pablo-Picasso - 94132 Fontenay-sous-Bois cedexTéléphone : (1) 49 74 11 11 - Télex : 262 958 - Télécopie : (1) 49 74 11 0110

Pagina 27

1THIS IS A CAT II 2H3 APPLIANCE01773 828100IN WARRANTYTECHNICAL HELPLINE01773 828400THELIA 30 E

Pagina 28 - SETTINGS

2INSTALLATION SECTIONIntroduction... Page 3Commissioning ...

Pagina 29 - CHANGING GAS TYPE

3INTRODUCTIONThe THELIA 30 E boiler is a wall mounted combina-tion boiler providing central heating and instanta-neous hot water.The boiler is of the

Pagina 30

4Protection against freezingIf the boiler is to be out of use for any long periodsduring severe weather conditions, it is recom-mended that the whole

Pagina 31

5DIMENSIONSBOILER SCHEMATIC1-Bypass2-Loss of water pressure switch3-Pump4-Automatic air vent5-Expansion vessel6-Injector manifold7-Ignition electrode8

Pagina 32 - 102740 D 08/96

6TECHNICAL DATAHeating output adjustable from 12,7 kW to 30,2 kW43330 Btu/H to 103,040 Btu/HEfficiency 81 %Maximum heating temperature 90 °CExpansion

Pagina 33 - THELIA 30 E

7BOILER CONNECTIONSFrom left to right the fixing jig comprises :A-Heating return with isolating valve (m).B-Cold water inlet with isolating valve (p).

Pagina 34

4Diagram. 1OPENING THE CONTROL PANEL COVERCONTROLS AND LIGHTINGHab 129Lighting the THELIA 23 and THELIA SB 23 boilers+1 / ON1 / ON3 - Wait for20 secon

Pagina 35

8BOILER LOCATIONClearancesThe position of the boiler must be such that there isadequate space for servicing.The recommended clearances are:40 mm eithe

Pagina 36 - DRAINING

9Flowcontrol valveDrain pointFilling pointBypassvalve Minimum 22 mm diameterTundish(supplied)Pressurereducingvalve(supplied)DomesticwaterHeatingcircui

Pagina 37

10FLUE INSTALLATIONThe boiler is only suitable for top outlet flue con-nection.A - Flue to rear of boiler• Mark correct position of hole from template

Pagina 38 - By-pass open

11FLUE INSTALLATIONFlue option Cutting length (mm) Commentsouter pipe inner pipeSide flue left e + a - 1479 e + a - 1479 maximumdimension "X&quo

Pagina 39 - BOILER CONNECTIONS

12ELECTRICAL INSTALLATIONWARNING. This boiler must be earthed.All system components shall be of an approved type.Connection of the whole electrical sy

Pagina 40 - BOILER LOCATION

13COMMISSIONINGThe commissioning and first firing of the boiler mustonly be done by a competent person.Gas installationIt is recommended that any air

Pagina 41

14COMMISSIONING• Set boiler thermostat to maximum and checkthat any external controls are calling for heat.• Check that the reading on the gauge match

Pagina 42 - FLUE INSTALLATION

15Gas valve settingAll boilers are tested and factory set during manu-facture. Should it be necessary to reset a gas valve,for example after replaceme

Pagina 43

5THELIA SB 23THELIA 23, THELIA 23 E● Hot water : Turn theknob (diagram. 5) in or-der to obtain a watertemperature suited tothe demand.Reg 012Diag. 5R

Pagina 44 - ELECTRICAL INSTALLATION

6Saunier DuvalAUTOTIMERC1onoff enterres12.00Diagram. 11Saunier DuvalAUTOTIMERC1onoff enterres13.00Diagram. 12Saunier DuvalAUTOTIMERC1onoff enterres7.5

Pagina 45

7To Set Your Own Programme "On" and "Off" TimesNote. The timeclock can be set to give a minimumof one and a maximum of three &quo

Pagina 46

8CLOCK - INSTRUCTIONS FOR USETo Check the Programme "On" and "Off" TimesThe programmed "On" and "Off" times ca

Pagina 47

9Protection against freezingIf the boiler is to be out of use for any long periodsduring severe weather conditions, it is recom-mended that the whole

Commenti su questo manuale

Nessun commento